NSW EV charging grants 2026 · Kerbside, car park and fleet

NSW EV charging grants, scoped and installed

The NSW Government has put $16.5 million into new EV chargers: $5 million for kerbside and car park charging, and $11.5 million for fleets. The grant covers part of the cost. The supply, switchboard and network work decides whether a funded site gets built on time, and that is our trade.

At a glance
Kerbside Round 3 closes21 Dec 2026, 5 pm
Kerbside and car parkUp to $30,000 per DC port
Fleets of 21+ vehiclesUp to $8,000 per DC port
Public EV charging bays installed by eProjects
01 · The two programs

Two grants, different rules on who applies

The kerbside money only goes to charge point operators. The fleet money goes to the business running the vehicles. Either way, the application needs a costed scope from an installer who has checked the site.

Kerbside and car park (Round 3)Fleet charging
Funding Kerbside and car park$5 million. Grants of $100,000 to $1,000,000. Fleet$11.5 million.
Per port Kerbside and car parkUp to $6,000 per AC port and $30,000 per DC fast charging port. FleetUp to $2,000 per AC port and $8,000 per DC fast charging port.
Who applies Kerbside and car parkCharge point operators only. Site owners take part by hosting an operator's chargers. FleetBusinesses, not-for-profits and councils running at least 21 cars, SUVs, vans, utes and small trucks up to 4.5 tonnes.
Where Kerbside and car parkKerbside (power poles and verges), council car parks and, for the first time, commercial car parks, across 37 eligible council areas. FleetYour depots and sites.
Status Kerbside and car parkOpen 21 September 2026. Closes 21 December 2026 at 5 pm. FleetAnnounced 19 September 2026. Guidelines and dates to be confirmed.

From the NSW Government announcement of 19 September 2026 and the Round 3 program page, checked 28 September 2026. Grant rules change, so confirm on the Round 3 page and the announcement before you apply.

02 · Where we fit

Three ways into the funding

01

Charge point operators bidding for Round 3

Your bid is only as good as the sites in it. We check supply at each candidate site before you commit it, price the whole scope including upgrades and civil works, and give you a delivery programme you can put in the application.

Once funded, we lodge the network applications with Ausgrid or Endeavour Energy and build across Central, Southern and South Western Sydney.

02

Commercial car park owners

For the first time, chargers in commercial car parks can be co-funded. Shopping centres, clubs, pubs, dealerships and fast food sites are all candidates. You can't apply yourself, but an operator can apply to put chargers on your site.

An operator will want to know what your site can take. We assess your supply and switchboard first, so you know what your car park can take before you talk to them.

03

Fleets of 21 or more vehicles

You apply for this one directly. We give you what the application needs: a site assessment, a charger count modelled against your run sheets, and a costed scope including any supply upgrade.

More on fleet depot charging and truck and bus depots.

03 · What you get from us

Application-ready scope, then the build

Most EV installers stop at the charger and call an electrician for everything else. On grant projects the supply and network work sets the timeline, so it has to be priced properly from the start.

Our commercial track record →
Site & supply assessment Charger count & specification Costed scope incl. upgrades & civils Delivery programme for the application Network connection applications Installation & commissioning Payment, access & load management Monitoring, service & fault response
04 · Common questions

Answers before you enquire

Anything else, send us an enquiry or call Tim on 0409 986 882.

Can a business apply for the NSW kerbside and car park EV charging grant?

No. Round 3 is only open to charge point operators. Commercial car park owners take part by hosting chargers that an operator applies for, installs and runs.

How much funding is available per charger?

Kerbside and car park sites: up to $6,000 per AC port and $30,000 per DC fast charging port, with grants from $100,000 to $1,000,000. Fleets: up to $2,000 per AC port and $8,000 per DC fast charging port.

When does Round 3 close?

21 December 2026 at 5 pm. DC sites that need a network connection typically take three to four months, driven mainly by network approvals, so site and supply checks are worth doing now.

Who can get the NSW fleet charging funding?

Businesses, not-for-profits and councils running at least 21 passenger vehicles, SUVs, vans, utes and small trucks up to 4.5 tonnes. It was announced on 19 September 2026. Guidelines and dates are still to be confirmed.

Will you help with our grant application?

Yes. We provide the site assessment, charger specification, costed scope and delivery programme the application needs. You, or your charge point operator, submit it.

Do grant-funded chargers need renewable electricity?

The announcement says funded charging sites must use 100 per cent renewable electricity. Check the program guidelines for how that applies to your project. If you want on-site solar and battery alongside the chargers, we design and install that too.

Related
Round 3 closes 21 December 2026

Got a site in mind? Get the supply checked before the deadline.

Tell us the address and what you want to charge. Tim will come back to you, weekdays 7am to 5pm.