Solar, battery and EV charging in St George
The St George area runs from the older brick homes of Bexley and Carlton through the high-density towers of Hurstville and Kogarah to the bayside strip at Brighton-Le-Sands. It is a mix that needs everything from a single switchboard upgrade to strata-scale solar and EV provisioning.
Four service lines, from single homes to whole buildings.
Hurstville to Brighton-Le-Sands
Resident and visitor charging in apartment basements, plus retail and medical sites
02 Commercial solar & battery in St GeorgeCommon-property solar for strata buildings, and retail along Forest Road
03 Residential solar, battery & EV in St GeorgeSolar, batteries and home charging for the brick homes of Bexley and Carlton
04 Electrical services in St GeorgeSwitchboard capacity upgrades, common-area lighting and building maintenance
Why St George is different
Apartment density around Hurstville, Kogarah and Wolli Creek means a lot of our St George work is strata: common-property solar, EV charging for residents, and switchboard capacity that was never designed for either. Retail strips and medical precincts along Forest Road and the Princes Highway make up the rest.
Strata work sets the pace in St George. Getting solar or resident EV charging onto a Hurstville or Wolli Creek building means committee approval, a common-property metering arrangement and a switchboard that was sized long before anyone charged a car at home. We do that documentation as part of the job.
Suburbs we cover in St George
Postcodes 2205 · 2207 · 2209 · 2216 · 2217 · 2218 · 2219 · 2220 · 2221 · 2222 · 2223 · 2224
Not listed? We almost certainly still cover you. Send us an enquiry and we will confirm.
Working in St George
Anything else, send us an enquiry or call Tim on 0409 986 882.
Do you charge a call-out fee to St George?
No. St George is inside our standard service area, so quotes and site visits are free. That includes strata inspections where we need to look at the main switchboard and the car park together.
How quickly can you get to a job in St George?
Maintenance and fault work is usually within a day or two. Strata projects take longer at the front end because committee approval and metering arrangements have to be settled before we can start.
Do you handle the Ausgrid application?
Yes. Connection, embedded generation and supply upgrade applications to Ausgrid are prepared and lodged by us as part of the job.
Are you licensed and insured for work in St George?
Yes. We hold a NSW electrical contractor licence, Clean Energy Council accreditation for solar and battery installation, and full contract works and public liability cover.
NSW and federal incentives apply in St George too.
We assess eligibility and handle the paperwork as part of every quote, commercial and residential.
