Commercial EV chargers for Sydney sites.
AC and DC fast charging for dealerships, service centres, fleet depots, workplaces and public sites, designed, supplied, installed and commissioned by one contractor, including the supply and switchboard work most installers subcontract out.

Every site charges differently.
Dwell time, vehicle mix and available supply decide whether you need AC, DC, or both.
Delivery bays, workshop diagnostics, customer chargers
02 Fleet depotsOvernight AC banks with load management
03 Workplace parkingStaff bays, access control, cost recovery
04 Retail & hospitalityDwell-time charging that pulls foot traffic
05 Fast food & drive-thruHigh-turnover DC for 10–20 minute stops
06 EducationCampus car parks, buses and staff fleets
07 Property developersEV-ready infrastructure to meet DA conditions
08 Public chargingCPO sites, grid connection and civil works
09 Heavy vehicles & bus depotsMajor supply upgrades, substations and depot-scale charging
NSW Government co-funding is now available for kerbside, car park and fleet charging. See NSW EV charging grants →
AC or DC? It depends on how long the car sits.
We're charger agnostic. We specify from all major AC and DC brands based on your site, not a supply agreement.
Indicative outputs for design purposes.
Five-minute charging is already shipping overseas.
Megawatt-class terminals and batteries that take 10 to 80% in under four minutes are in production in China today. Those vehicles are coming here. We build sites now so the upgrade is a hardware swap, not a rebuild.
Flash charging→Manufacturer-stated figures from overseas launches. Australian availability and certification will vary.
How a rollout runs
Two weeks for a straightforward AC install; 3–4 months where DC fast charging or a supply upgrade is involved.
Supply capacity, switchboard, cable routes and metering reviewed on site.
Fixed scope, hardware options, rebate feasibility and a dated programme.
Network applications, connection agreements and compliance paperwork.
Staged around your operations, then tested and certified at handover.
Monitoring uptime, servicing and fault response under an agreed response time.
A commercial electrical contractor doing EV work, not the reverse.
Most EV installers stop at the charger and call an electrician for the rest. Supply upgrades, switchboards and network coordination are our core trade, which is why complex commercial sites end up with us.
Our commercial track record →That's the first thing we check. If the incoming supply won't carry the load, we'll price the upgrade or design load management so you get the charging you need without one.
Across Central, Southern and South Western Sydney
Eight regions, each with its own local team and network relationships.
- 01Sutherland Shire
Commercial EV charger installation
- 02St George
Commercial EV charger installation
- 03Canterbury Bankstown
Commercial EV charger installation
- 04Macarthur
Commercial EV charger installation
- 05South West Sydney
Commercial EV charger installation
- 06Western Sydney Aerotropolis
Commercial EV charger installation
- 07Sydney Metro
Commercial EV charger installation
- 08Inner West
Commercial EV charger installation
EV charging incentives can offset a commercial install.
We confirm what your site is eligible for and lodge the paperwork as part of the quote.
