EV-ready infrastructure for property developers
EV charging designed in at build stage, not retrofitted at twice the price. For apartment, mixed-use and commercial developments across Sydney, we design the supply, distribution and conduit so every bay can be energised as demand arrives.

Why this pays for itself
Satisfies DA and green-star conditions
EV-ready provisioning is now standard in consent conditions. We design and certify it to the condition wording.
Cheaper in the slab than retrofitted
Conduit, cabling and switchboard capacity installed during construction costs a fraction of a strata retrofit.
Hand over a system strata can run
Metered, individually billed bays with documentation the owners corporation can actually operate.
What we would specify for your site
We are charger agnostic. Hardware is specified from all major AC and DC brands to suit the site, not a supply agreement.
Indicative specification for design purposes. Confirm final scope with eProjects.
One contractor, whole job
Most EV installers stop at the charger and call an electrician for everything else. Supply upgrades, switchboards and network coordination are our core trade.
Our commercial track record →Across Central, Southern and South Western Sydney
Eight regions, each with its own local team and network relationships.
Property developers EV charging
02St GeorgeProperty developers EV charging
03Canterbury BankstownProperty developers EV charging
04MacarthurProperty developers EV charging
05South West SydneyProperty developers EV charging
06Western Sydney AerotropolisProperty developers EV charging
07Sydney MetroProperty developers EV charging
08Inner WestProperty developers EV charging
Answers before you enquire
Anything else, send us an enquiry or call Tim on 0409 986 882.
What does EV-ready actually mean for a development?
Supply capacity, distribution boards, cable pathways and conduit sized and installed so a charger can be added to a bay later without breaking concrete or upgrading the incoming supply.
How is charging metered and billed in apartments?
Each bay can be metered to its lot so residents pay for their own energy, rather than charging landing on common property. We design the metering and billing arrangement with the strata scheme.
How many bays should be EV-ready?
Planning controls increasingly require provision for all or most bays. Our usual recommendation is full infrastructure provision with chargers fitted progressively as owners request them.
Can you work with our electrical consultant and builder?
Yes. We work from consultant documentation or design the EV scope ourselves, and coordinate with the builder’s programme as the electrical contractor on site.
Federal and State Incentives - Cut the cost of your installation, we handle the rebates.
We assess eligibility and handle the paperwork as part of every quote, commercial and residential.
