Solar & battery for every other kind of commercial site
Gyms, churches, storage facilities, laboratories, workshops, car parks, community clubs, data rooms. If it has a roof, a meter and a daytime load, the same arithmetic applies. Send us twelve months of bills and we will tell you whether it stacks up, including when it does not.

The three things that decide any site
How much you use while the sun is up
Self-consumption is the whole game. The more of your load that falls between 8am and 5pm, the more of the array you use at full retail value instead of exporting it for a fraction.
What your roof can carry
Orientation, shading, age and structure decide the usable area and the yield. We survey it properly rather than estimating from an aerial photograph.
What your tariff punishes you for
If demand or capacity charges are a large share of the bill, storage may save more than extra panels. The interval data tells us which lever to pull.
What we would specify for your site
Brand agnostic. Panels, inverters and batteries chosen on warranty and serviceability, sized from your interval data.
Indicative specification for design purposes. Confirm final scope with eProjects.
One contractor, whole job
Whatever the building, the electrical work is the same discipline: supply, switchboard, protection, connection and certification. That is our trade.
Our commercial track record →Across Central, Southern and South Western Sydney
Eight regions, each with its own local team and network relationships.
Answers before you enquire
Anything else, send us an enquiry or call Tim on 0409 986 882.
My site is not on your list. Do you still do it?
Yes. The sector pages exist because the commercial case differs by industry, not because the work does. Send the details and we will assess it the same way.
How small is too small?
Below roughly 20 kW you are in residential-scale territory, which we also do. We will point you to the right team rather than over-scope the job.
Will you tell us if it does not stack up?
Yes. A modelled payback that does not work is a useful answer, and we would rather give it than sell a system that disappoints.
How long does the whole process take?
Feasibility in about a week from receiving your bills. From acceptance, most commercial installations are complete within six to twelve weeks depending on network approval.
Federal and State Incentives - Cut the cost of your installation, we handle the rebates.
We assess eligibility and handle the paperwork as part of every quote, commercial and residential.
